January 22
All-PI meeting

January 5
OGI01: Visit using NMFS vessel Siliqua and 10 zodiac. Dive to inspect mooring; light fouling, no damage to surface elements and all rubber tethers intact; zincs need replacing. Attempt to download data, but download software fails, re-deploy instrument. Instrument battery at 15.4V. The above surface part of buoy is also completely undamaged and intact. Deteriorating conditions prevent change of batteries for navigation light. The buoy is surrounded by crab pot markers; therefore the crab fisherman are well aware of its presence and it is clear of tugboat and other fishing boat traffic.

1998
January | February | March | April | May | June | July | August | September | October | November | December

December:

November:

October:

September:

September 25
Fisheries Cruise (Photos)

September 17
OGI01: Replace batteries for lantern with 2x 100Ah lead acid units. Download data from ADP. Swing ADP compass. Re-drill ADP mounting, recover radio flange and bolt in place.

August:

August 14
OGI01: Deploy 500kHz ADP, sontek battery pack, 120s every 900s. No joy with cell phone link.

July:

July 17
Deployed OGI01 (Photos)

June:

6/28 Cruise and a bunch of text about the cruise here.

May:

April:

March:

February:

January:



OHSU assumes no legal responsibility for the accuracy, completeness or usefulness of this information. See DISCLAIMER for details.


Copyright © 2008 Center for Coastal Margin Observation & Prediction (CMOP) All rights reserved.
OHSU Notice of Privacy Practices Email to: webmaster@stccmop.org